HEIMDALL / OFFSHORE

Your offshore
signals.
In context.

The equipment changed.
What else was happening?

Heimdall is being developed to connect equipment observations, inspection records and operating context into a shared picture. Start with your existing sources, trace the evidence and see which questions still need an answer.

Pilots under development

PUMP A / ILLUSTRATIVE RECORDSCASE 031
VIBRATION2.1 → 7.2 mm/s
BEARING TEMPERATURE58 → 74 °C
DISCHARGE PRESSURE5.0 → 4.2 bar
Same asset. Different measurements.Synthetic values · not operating limits or a diagnosis
Existing asset data.Operating context.Visible data gaps.
01 / FOR ASSET & OPERATIONS TEAMS

An asset has a history.
A signal needs that context.

A pilot could connect available condition-monitoring exports, process histories, thermal inspection records and operating logs. Interfaces, permissions and source quality are assessed with the team.

EQUIPMENT OBSERVATIONS

Follow the same asset.

Put vibration, temperature and pressure records around a common asset reference and timeline.

OPERATING ACTIVITY

Test a plausible explanation.

A planned run-up or maintenance task can change the question. Keep the operating record beside the measurements.

SOURCE AVAILABILITY

Keep silence visible.

A feed that stops is a data gap. Make stale readings distinguishable from current evidence.

02 / EXPLORE THE OFFSHORE CASE

One pump train.
Three different questions.

Change the scenario, inspect a source and toggle the available evidence. Add an operating record or restore a missing feed to see what changes—and what remains uncertain.

HEIMDALL / OFFSHORE ASSET ASYNTHETIC CASE / 031

OFFSHORE ASSET AILLUSTRATIVE LAYOUT
Associated Separate asset No current data / off
3records associated
16 smeasurement span
0stale data feeds
14:32:30Z
14:32:00Z+30 s+60 s

Move left to review the picture before all samples arrive.

ASSET OBSERVATIONSSELECT TO INSPECT
SITUATION 031 / EVIDENCE REVIEW

Why associated?

    What is still missing?

      What could be checked next?

      This demo does not operate equipment or execute actions.
      See the rules behind this demo

      This browser-only example uses pre-authored synthetic measurements. A group needs at least two source types mapped to Pump A, within 30 seconds from first to last measurement and known timing uncertainty within ±2 seconds. Crane B is a separate asset. In the missing-telemetry case, a ten-minute-old sample is excluded from the current situation. Operating records add context without proving a cause. No sensors, live systems or AI services are connected. Values are illustrative, not operating limits.

      Synthetic data · Anonymous asset references · Human review required

      03 / A REVIEW LAYER FOR THE TEAM

      Better context.
      Responsible decisions.

      The intended role is a supervisory picture across available sources, with a traceable basis for human review. It can inform a wider Command and Control (C2) workflow where the use and integration have been validated.

      Operational procedures, alarms and protective systems remain with the responsible organisation. This concept demonstration does not diagnose a fault, assess safety or replace a control or safety system.

      CONTINUE EXPLORINGBuildings →UAP field research →